Tunnel Backfill Repair Method Using Urethane Injection "Tn-p Method"
Polyurethane injection method for tunnel backfill repair with excellent workability.
The "Tn-p Method" is a tunnel repair method designated as a "Technology for Promotion of Utilization" by NETIST. The injection machine's pump sends both Liquid I and Liquid R to the mixing head, where they are mixed through air agitation to form foamed polyurethane (Achilles Airon-R). The injection equipment is very compact, and the filling material is transported in liquid form (in drums) at about 1/40 to 1/12 of the volume after foaming, allowing all materials and equipment to be loaded onto a single 4-ton truck. 【Features】 ■ Excellent workability ■ Compact injection equipment ■ All materials and equipment can be loaded onto a single 4-ton truck ■ Effective for stopping groundwater *For more details, please refer to the PDF document or feel free to contact us.
- Company:サン・ロード
- Price:Other